Commercial & Property Developers

You don’t need a
new building to
compete like one.

The most effective repositioning plays don’t touch the floor plate. They transform what tenants see first.

Office lobby with a glass-railed stair over polished stone and plaster surfaces

Liberty Park 6 · Herndon, VA

84% Class A rent premium

The Market Context

The gap between Class A
and everything else
has never been wider.

In H1 2025, 71% of all office investment targeted Class A or Trophy product, while Class B and C buildings continued losing tenants. The finish is the signal. Senza is how you send it.

Office reception desk under a double-height glazed wall with pendant globes

The lobby is where a prospect prices your building, before they reach the elevator.

The First Sixty Seconds

How We Work

Built around your schedule,
not ours.

A project manager’s job is to protect the schedule, the budget, and the lease commencement date. Our process is designed around those three constraints.

Pre-Mobilization

Substrate & Conditions Audit

We visit the site before mobilization to assess substrate condition, MEP clearances, temperature and humidity history, and existing finish conflicts. Written report within five business days. No on-site surprises.

Site Audit Report

Step 1 of 5

Book a Consultation

Project Record

Projects that finish on time,
every time.

Representative project types across Senza’s commercial work. Metrics reflect actual project outcomes.

Total Cost of Ownership

Painted drywall has a
maintenance cycle.
Plaster doesn’t.

Asset managers calculating lifecycle costs across a portfolio understand that the finish specified today has a budget implication every year for the next twenty.

  • Repainting cycleRepaint only when desired, not required
  • Damage repairLocalized patch with no visible evidence
  • Rebrand / recolorTopcoat over existing system, no removal
  • Acoustic performanceNRC 0.75 to 1.00+ integrated in finish layer
  • End-of-life upgradeNew topcoat over existing system
  • WELL / LEED contributionWELL acoustic credits, LEED material credits

Typical commercial lobbies show a 15 to 20 year maintenance cost advantage for plaster over painted drywall.

Book a Consultation